Compartir
Final Environmental Assessment - Industrial Carbon Capture and Sequestration (ICCS) Area 1 Project - "CO2 Capture from Biofuels Production and Sequest (en Inglés)
National Energy Technology Laboratory
(Autor)
·
Createspace Independent Publishing Platform
· Tapa Blanda
Final Environmental Assessment - Industrial Carbon Capture and Sequestration (ICCS) Area 1 Project - "CO2 Capture from Biofuels Production and Sequest (en Inglés) - Laboratory, National Energy Technology ; Energy, U. S. Department of
$ 41.140
$ 57.140
Ahorras: $ 16.000
Elige la lista en la que quieres agregar tu producto o crea una nueva lista
✓ Producto agregado correctamente a la lista de deseos.
Ir a Mis Listas
Origen: Estados Unidos
(Costos de importación incluídos en el precio)
Se enviará desde nuestra bodega entre el
Jueves 04 de Julio y el
Martes 16 de Julio.
Lo recibirás en cualquier lugar de Chile entre 1 y 3 días hábiles luego del envío.
Reseña del libro "Final Environmental Assessment - Industrial Carbon Capture and Sequestration (ICCS) Area 1 Project - "CO2 Capture from Biofuels Production and Sequest (en Inglés)"
DOE prepared this EA to evaluate the potential environmental consequences of providing a financial assistance grant under the American Recovery and Reinvestment Act of 2009 (ARRA) in a cooperative agreement with Archer Daniels Midland Company (ADM). If ADM received the funding, the company would demonstrate an integrated system of carbon dioxide (CO2) capture in an industrial setting and geologic sequestration in a sandstone reservoir. The CO2 that would be sequestered is currently a by-product of ADM's Decatur fuel-grade ethanol production facility. ADM would capture approximately one million short tons of CO2 per year using dehydration and compression. The compressed CO2 would be piped approximately one mile to an injection well and sequestered in the Mount (Mt.) Simon Sandstone Formation, a saline reservoir. The project team members include ADM, the Illinois State Geological Survey, Schlumberger Carbon Services, and Richland Community College. DOE's proposed action would provide approximately $141.4 million in financial assistance in a cost-sharing arrangement to ADM. The cost of the proposed project would be approximately $207.9 million. This EA evaluates the environmental resource areas DOE commonly addresses in its EAs and identifies no significant adverse environmental impacts for the proposed project. The proposed project could result in beneficial impacts to the nation's energy efficiency and the local economy, and could contribute to a minor reduction of greenhouse gases.
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.
✓ Producto agregado correctamente al carro, Ir a Pagar.